Wood Plastic Composite (WPC) Manufacturer in China
Tel: +86(752) 2222-845 Mobile: +86-139-2288-7311
info@www.protechwood.com Contact us at any time
Building 1, Huamao Building, Wenchang Road 1, Huizhou, Guangdong, China
Monday - Saturday 08:30-18:00

Blog Posts

May 4, 2015

Protechwood – Transforming a 1920’s Era Craftsman Residence: A Do-It-On your own Odyssey

As the new operator of a 1924 craftsman home “fixer-upper”, I was incredibly energized to begin remodeling. The home experienced initial been remodeled in the 1970’s with the addition of laminate flooring and sola-tubes. In the 1990’s dual pane windows ended up set up. Due to the fact that time, the home was rented to rotating teams of college college students ensuing in huge neglect. I experienced grand ambitions on eliminating the dark coloured paneling in the living room, putting in superior flooring, correcting the sagging ceiling, and correcting the sloping foundation in the dining room. My college-aged son volunteered to support me. I was so energized to start out earning this sweet tiny craftsman residence my home.

Having established Builders Site Security, a surface area protection and dust control business, I felt confident that I could safely rework an older home. I understood that direct paint and asbestos would almost certainly be an situation because the residence was designed prolonged right before 1978. I built sure to provide my ZipWall&trade poles, plastic sheeting, Direct Ready&trade containment package, carpet protection, security clothing, tapes, and tools to my new home. We begun with the bedrooms because they wanted the the very least amount of do the job. New paint and new carpet did wonders to enhance the hominess. Implementing paint colours with contrasting trim emphasized the window and door moldings distinguished in craftsman type households. On near inspection I uncovered that in the two bedrooms, the ceilings consisted of rectangular panels sure to incorporate a copious amount of asbestos. Rather than don a respirator and dust collecting tools to consider to safely remove the panels, I determined to paint the ceilings and depart them be. This was to be the initial in a prolonged checklist of compromises between what I experienced envisioned and what occurred all through the real rework.

Following up was the kitchen area, which was in superior shape than the rest of the rooms. Soon after eliminating huge quantities of useless bugs from the sola-tube, I was impressed by the quantity of light it introduced in to the windowless kitchen area. When I understood that the flooring was glue down laminate and would be tough to remove, I determined to preserve it as is and target on the other pieces of the home. New paint and shiny white trim did wonders to enhance the glimpse of the kitchen area. An equipment repair guy and an electrician ended up ready to get the kitchen area stove operating adequately.

The living room experienced dark paneling set up all through the 1970’s in an attempt to “match” the paneling initially set up in the home all through the 1920’s. More than the several years, the paneling experienced been spray painted off-white and it was rather obvious. Despite the fact that the paneling would be effortless to remove, the primary wall panels from the 1920’s most probably contained asbestos. Soon after I determined to texture paint more than all the partitions to match and with the addition of paint and shiny white moldings, the partitions seemed terrific. A new floor and the addition of craftsman type home furniture managed the feel of an older home. The old residence was really setting up to glimpse good!

A little room addition jutting out from the kitchen area would be made use of as my home place of work. The place of work room was a problem as the floor was sloping from an old foundation. Soon after inspection by a foundation skilled and also from a community contractor, we determined that we could dwell with the 1″ slope as it was rather common for the area and would cost more than $3000 to correct. I was setting up to believe this old residence was not so sweet following all! Making use of liquid cement to stage the floor we ended up ready to give a pretty flat floor base for the installation of wood flooring. After the partitions ended up painted, the floor set up, and the trim changed, the room seemed terrific. I have only not long ago uncovered that the partitions apparently have no insulation as this room is the coldest in the residence.

Our major problem was the guest lavatory. The lavatory experienced the primary orange, cast iron tub from the 1920’s and it was in terrible shape. The cupboard was built from particle board that experienced decayed a number of many years ago and the rest room ran continuously. The water supply did not come from the again of the cupboards but from the side, so a huge pipe and the residence water supply shutoff ended up the two located in the decaying cabinetry. Encompassing the old tub was an affordable plastic surround that experienced holes, caulking and nails protruding from it really is attachment to the wall. There ended up also an old collection of slender particle board cupboards in one particular corner that we would also need to remove. The faucet was damaged and there was no incredibly hot water relationship from the faucet. The cupboard and tub ended up not in latest code as they ended up way too near to the rest room.

Removing the 5 ½ ft cast iron tub took most of a working day. Sadly it would need to be carried more than the new flooring set up in the dining room so surface area protection was a ought to. We meticulously safeguarded the wood floor with a recycled cotton floor protection merchandise and made use of blankets to support go the old, large tub. After it was taken out, it took 4 guys to elevate it for recycling. After taken out, it was clear that the floor would need to be reinforced as the tub was hardly supported. Soon after reinforcing the tub, we concluded the flooring with plywood leaving an eighteen” access panel for the plumber. Outdated molded sheetrock was taken out from the partitions surrounding the tub. Approximately ninety several years, and at the very least twelve distinctive layers of wallpaper ended up taken out from the lavatory partitions that ended up underneath the sheetrock. We then designed a slender, 2 x 2 wall in which to insulate the lavatory from the outside wall of the home which experienced no insulation. Due to the fact the room was so narrow a 2″ wall would give insulation still preserve the tub and rest room in code. We made use of “greenboard” mold resistant board on the outside of the wall and a layer of breathable residence wrap on the inside to the wall so that humidity would escape and there would not be a mold situation again in the lavatory. We also made use of Styrofoam to insulate the slender wall in between the residence wrap and greenboard.

At this issue my son remaining for college and I was now completely on my very own. Time to contact the plumber! After the plumber was contacted to install the tub I found out that the lavatory floor sloped a good 1.5 inches absent from the plumbed wall, a comparable situation as the dining room. At this issue I was setting up to detest this tiny old residence! To preserve the tub stage mortar was made use of however the tub was no more time resting on the tile floor, so a disguise to cover the area exhibiting under the tub was vital. Quite a few weeks later I finally experienced concluded cutting, putting in, and sealing the tile and grout surrounding the tub. Despite the fact that I meticulously safeguarded the tub with short term surface area protection, I even now managed to make a little chip on the tub surface area all through clean-up. I could see initial hand the value of protecting not only the tub but also the surrounding floor and cupboards. I also decided that from now on, tiling tub surrounds was ideal remaining to the execs! Now it was time to install complete parts and repair the ceiling from the gap the plumber remaining whilst putting in the shower head. A tiny drywall repair, some decorative moldings, and a contemporary coat of ceiling paint worked magnificently. Trim parts for the wood cupboards and toe kicks ended up set up and touch up paint was applied to finalize the room.

Someplace together the way I managed to clog my kitchen area drains as they continued to again up into the two sinks and my endeavours at utilizing a snake to unclog the pipes was futile. Will the repair do the job on this tiny old residence by no means finish?

Supply by Protechwood

All Posts , , , , , , , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Contact Us
Building 1, Huamao Building, Wenchang Road 1, Huizhou, Guangdong, China
+86(752) 2222-845
+86-1392-2887-311